14 December 2008

Exhausted! Well, almost...

The Repowering Project: Day 25&26 (Weekend)

Weather miserable, raining nearly all day. Engineer spent the morning in the back of the guest cabin and leaning over the day tank re-routing the port side rear cockpit drain. Then he began work on the platform to support the water trap. Gods on our side again - he found two nice heavy stainless steel brackets almost the perfect size and shape in the bosuns scrap bin. Slight setback when he realised that the web on to which they are to be mounted is not vertical, so they need to be bent, no simple matter. Rain finally stopped in the evening, allowing us to open the lazarette to mount the skin fitting for the exhaust hose. Captain on the outside, mate on the inside tightening up the bolts when another rain squall came through, leaving the captain distinctly damp and adding wet clothes to the chaos below decks.

Early Sunday prepared to go back in the water. Fitted one end of the exhaust hose to the skin fitting, leaving the rest looped around in the lazarette. Engineer found that he could bend the brackets in the bosuns' workshop using a large spanner and a vice (well he is a vice-president). Back to platform construction.

Mate meanwhile has measured and cut a few more bits of soundproofing to be put in place once the motor is permanently in place, passed bits and pieces to the engineer as requested and tried to keep the ship in some sort of order.


Sake says:
Not trying nearly hard enough if you ask me. Can't jump on the starboard seaberth any more because it's occupied by tools, boxes, wet clothes, dirty washing. And no sensible cat would go on deck as the wind would blow your whiskers off. I did go for a walk late last night when they went for a shower - wasn't wet but very cold - had some trouble relocating Nahani as all the boats look much the same to me from underneath.

Later Nahani was relaunched without real drama, although gusty winds made pulling her out of the cradle on the slip and round the corner to the slipping berth fairly hard work for us, Danny and two helpers. Work continued without much change, except that it was very nice being able to step from boat to the jetty, instead of climbing up and down the ladder.